EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
PhilVogel
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (23)
Research
Workshop
- (1)
Empennage
Fuselage
Firewall
Tail Feathers
- (15)
Wings
- (7)
-
Spar and ribs rivet
-
R wing
-
Pitot
-
Gap seals
-
Top skin
-
Wing wiring
-
Flap and aileron...
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Phil Vogel
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
143.7
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 27, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=PhilVogel
Home or Last Project Picture
Mar 05, 2021
Flap and aileron bell crank
- (2.5 hours)
Category: Wings
I completed the bell crank installation for both the aileron and flaps L wing. Safety wired securing cable around aileron bell crank, aileron bell crank safety wired and bolts torqued. Tele flex cable to flap bell crank installed and safety wired. Dean turns on the female tie rod, torqued to 15 inch pounds. Torque seal applied
0EAC74DA-FE00-446C-B983-2A6A58E4386E.jpeg
31D1FF75-7541-4668-B667-AF2A55FE6714.jpeg
EC2AAA3F-466A-4E03-AD9F-20943F8D2ED7.jpeg
AABD122A-CDE0-474E-B0F2-9A9053745E56.jpeg
02ECE840-9847-4F93-849B-BDA3895C87A1.jpeg
68409F6E-3707-4B1B-B2C1-2386BBADE0C1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.